The build, unfolding in pictures and timestamps โ€” filmed by the crew at Phoenix Gulch, transcribed by the ShellPIT, told by Terri. The full trail โ€” clips, transcripts, karaoke audio โ€” now lives in the ShellPIT (door open since 7/29).

Consent canon (8/1): consent consensus granted for the whole archive โ€” and every yes can still be revoked anytime. The door opens both ways.
JUL 12 ยท THE WORKSHOP FILLS

Parts with a pulse

E-track for the kitchen trailer, the 650-lb shelving still in its box, a shop fan โ€” and in the corner, a keyboard and a speaker with wheels. The Open Source Orchestra cleared its throat before the first board was cut.

Workshop floor: e-track rail, shelf box, keyboard and speaker
JUL 14โ€“17 ยท THE TOOL MAKER SESSIONS

"Cut right on the line"

Sixteen clips from three long evenings: a grinder used as a saw (it smoked โ€” "we almost built a fire"), the near-miss with a metal sawhorse, and a father teaching the cut that finally came out smooth. The veggie coffin's floor and walls went up โ€” "glued and screwed" โ€” and the kitchen trailer got its e-track, tables, and burners.

๐Ÿšช The door is open (7/29 canon). These evenings now live in The ShellPIT's Build Trail โ€” all sixteen clips, transcribed, with frame-stills and karaoke audio. Two favorites: "We Almost Built a Fire" ยท "Cut Right on the Line".
JUL 20 ยท THE SEMI COMES HOME

51 feet of anchor

The northAmerican trailer โ€” the anchor of the whole camp layout, the wall the Himalayas shade flies from โ€” rolled into Phoenix Gulch and settled against the hills. The map in the playbook is now a place in the world.

The 51-foot northAmerican trailer parked at Phoenix Gulch
JUL 20 ยท FIRST CUTS

The shower pods take shape

Two IBC totes, cage intact, exactly as designed: one with its top cut clean away, one with the doorway opening. Stacked open-to-open, these become the shower stall that stands on the troughs โ€” containment first, plumbing second.

IBC tote with top cut open, cage intact IBC tote with doorway opening cut
JUL 21 ยท THE CUSTOM HOSE

David's spec, made real

From the hydraulic hose shop: a 2-inch orange suction line, cam-lock at the top, stepping down to a brass manifold with two ball valves โ€” exactly the fitting chain drawn up in the July syncs. The parts cascade is nearly complete.

Custom 2-inch hose with cam-lock and brass ball-valve manifold
JUL 28 ยท FIRST WATER

"That's a shower right there"

Today. The trailer got Machinified โ€” transfer switch, panel and battery modes, 16 outlets, 30 amps on both sides โ€” and the full water loop ran: pump to kitchen, foot switch to greywater, float switches carrying water to the shower and back. Two float switches, one foot switch, zero spills.

"When a bunch of computer nerds fail, you just bring in the experts โ€” like The Machine."โ€” Shaka, that day at the Gulch
๐Ÿšช The door is open (7/29 canon). The first-water clips star in The ShellPIT's Machine Guidance window โ€” the naming, the Machinified trailer, the whole water loop taught end to end, with synced transcripts and karaoke audio.