πŸ₯ΆπŸ”¨

The Veggie Coffin

Visual build guide β€” David's 4Γ—8Γ—3 ft coffin cold box in 12 illustrated steps. Plywood shell, XPS heart, twin AC lungs. A key shelf in keeping the shell fed. 🐒

πŸ”¨ ΒΎ DONE Β· lid + hinges + interior foam this week Β· plywood-box design Β· ship-ready by early Aug πŸͺš
4' Γ— 8' Γ— 3'
inner box
~96 cu ft
case volume
~50Β°F
target temp
½–1 day
2–3 turtles
~$300
new spend
1

Stage Materials & Tools

~30 min
OWNED βœ… 4Γ— XPS 3"Γ—4'Γ—8' 2Γ— 5k BTU AC πŸ”₯πŸ”ͺhot knife ⬜PT-15 tape BUY β€” ONE HOME DEPOT RUN πŸ›’ 4Γ— Β½" ply + 1Γ— ΒΎ" ply 3Γ— 2Γ—4 Β· 6Γ— 2Γ—2 PL 300 Γ—4 πŸ”© screws+washers + hinges Γ—2 Β· handles Γ—2 Β· weatherstrip Β· white paint Β· min/max thermometer Β· jigsaw Β· drill Β· MOOP bag ⚠ PL 300 = FOAM-SAFE. Regular glue MELTS XPS. 🐒 "count it twice, cut it once"
  • Lay everything out and count it β€” nothing kills momentum like a mid-build store run.
  • Ply: 4 sheets Β½" CDX (walls Γ—3, lid Γ—1) + 1 sheet ΒΎ" (floor deck).
  • Lumber: 3Γ— 2Γ—4Γ—8' (skids), 6Γ— 2Γ—2Γ—8' (corners, AC + lid framing).
  • Glue: Loctite PL 300 Foamboard ONLY β€” ordinary construction adhesive dissolves XPS.
Visual learner tip: print this page, tape it to the workbench, cross off each diagram as it becomes real. πŸ“‹
2

Build the Skid Base

~45 min
TOP VIEW rim: 2Γ—4 on edge center joist 8' 0" 4' 0" SIDE VIEW air gap = no ground heat-soak skids on blocks/pavers 🐒 measuring diagonals 🐒supervising
  • Build an 8'Γ—4' rectangle of 2Γ—4s on edge, one joist down the center line.
  • Square it: measure both diagonals β€” equal diagonals = square frame.
  • Set it on blocks or pavers (playa: on stakes-anchored blocks). The air gap underneath is free insulation.
Pro tip: screw, don't nail β€” this box gets moved, and screws let you service it in 2027. πŸ”©
3

Deck the Floor + Foam Pad

~30 min
CROSS-SECTION (looking down the length) 2Γ—4 frame ΒΎ" ply 3" XPS produce case cases sit right on foam β€”25 psi Scoreboard takes it 🐒 MOOP patrol: shavings β†’ bag
  • Screw the ΒΎ" ply deck to the frame (2Β½" screws every 12" around the rim + center joist).
  • Cut one XPS sheet to fit inside the future wall line (~7'9"Γ—3'9") and lay it on the deck β€” dry, no glue, so it's replaceable.
  • 25 psi Scoreboard handles stacked produce cases directly. No extra wear layer needed.
MOOP tip: hot-knife all XPS cuts over a tarp, shavings straight into a sealed bag. The playa remembers. 🌱
4

Frame the Corners

~30 min
FRONT VIEW (long side) optional mid-stud 2Γ—2 corner uprights Γ—4 β€” cut to 36" 36" screw down through deck into rim (toe-screw) 🐒 πŸ“ "plumb or it's not done"
  • Cut four 2Γ—2 uprights to 36", screw one plumb into each corner of the deck.
  • These are your screw targets β€” every wall panel lands on wood, never on bare foam.
  • Add a mid-stud on each long wall if your ply feels wobbly (2 more 2Γ—2s).
Check twice: corners plumb with a level now = walls meet cleanly in step 9. πŸ“
5

Cut Walls β€” Ply & Foam Together

~45 min
CUTTING MAP β€” same cuts for Β½" ply (saw) and XPS (hot knife) LONG WALL 8' Γ— 3' 1' strip β†’ SAVE for lid! sheet A (and B same) END WALL4' Γ— 3' END WALL4' Γ— 3' strips β†’ lid sheet C XPS: repeat the exact same map 2 sheets β†’ long walls Β· 1 sheet β†’ ends 🧩 THE OFFCUT TRICK: the saved 1' strips tile together into a full 4Γ—8 layer = FREE lid insulation. Zero waste, zero MOOP. 🐒πŸ”₯πŸ”ͺ slow passes β€” turtle speed is correct here
  • Ply: circular saw/jigsaw. 2 sheets β†’ 8'Γ—3' long walls Β· 1 sheet β†’ two 4'Γ—3' end walls.
  • XPS: hot knife + straightedge, identical cuts. Slow steady passes, cut from both faces on 3" foam.
  • Save every 1-foot offcut strip β€” they tile into the lid's insulation layer. 🧩
Label as you cut: marker on painter's tape β€” "LW-1", "LW-2", "EW-A", "EW-B". Future-you says thanks.
6

Cut the AC Openings β€” One Low, One High

~40 min
END WALL A (4'Γ—3') AC cutout LOW END WALL B (4'Γ—3') AC cutout HIGH cold air sinks β†’ low intake + high exhaust = diagonal loop across all the cases πŸ“ Trace the ACTUAL COWSAR chassis + β…›" clearance. Measure YOUR unit β€” don't trust the spec sheet. 🐒 standing in the cold loop
  • One AC sits LOW in end wall A, the other HIGH in end wall B β†’ diagonal air circulation the full length of the box.
  • Trace the real AC chassis onto the ply, add β…›" clearance, drill a starter hole, jigsaw the opening.
  • Cut the matching hole in that wall's XPS with the hot knife using the ply as your template.
  • Frame each opening's sides with 2Γ—2 offcuts β€” the AC's weight bears on wood, never foam.
⚠ Orientation: window ACs must sit the way the maker intended (compressor oil). Face the correct side out, and plan a slight outward tilt (step 11).
7

Laminate: Glue + Screw Foam to Ply

~1 hr + cure
EACH WALL PANEL β€” exploded view PL 300 in S-beads press screws + FENDER WASHERS, ~16" grid washer spreads the load so the screw head doesn't pull through the foam Β· glue = strength, screws = clamps + insurance 🐒 full-shell press
  • PL 300 in S-pattern beads on the ply, press the matching XPS on, weight it flat.
  • 1ΒΌ" screws with fender washers through foam into ply on a ~16" grid.
  • Do all 4 walls, leave to cure per tube directions (30–60 min grab) while you prep step 8.
Order of operations: laminate FLAT on sawhorses, then raise. Gluing vertical panels is sadness. 🐒
8

Raise the Walls

~1 hr
TOP VIEW β€” walls land around the deck, foam faces IN ← long walls OVERLAP the end walls β†’ screwinto 2Γ—2 2Β½" screws every 12": down into deck rim + horizontally into the corner 2Γ—2s 🐒holds 🐒screws
  • Stand end walls first (they're lighter), screw into deck rim + corner 2Γ—2s.
  • Long walls go up next, overlapping the end-wall edges β€” hides end grain, strengthens corners.
  • Foam faces inward everywhere. Check the top edges land level all the way around.
Two-turtle job: one holds plumb, one drives screws. Don't hero a 3'Γ—8' panel in wind. 🐒🐒
9

Build the Lid β€” the Offcut Puzzle

~1 hr
LID CROSS-SECTION Β½" ply 🧩 the saved 1' offcut strips β€” taped seams 2Γ—2 lip frame drops INSIDE the box opening = self-locating + draft-stop TOP VIEW 2 handles (rope or gate pulls) Option: split the lid into 2 halves + hinges β€” grab veg without opening the whole box πŸ₯¬ 🐒 puzzle master
  • Lid = full 4Γ—8 sheet of Β½" ply + the 1-foot XPS offcut strips from step 5 tiled underneath (tape seams with PT-15).
  • Screw a 2Γ—2 lip frame around the underside perimeter, sized to drop just inside the box opening β€” the lid self-centers and blocks drafts.
  • Stick foam weatherstrip on the wall top edges for the seal.
  • Recommended: cut the lid into two 4Γ—4 halves, hinge one β€” daily kitchen grabs only open half the box, keeping the cold in.
Wind rule: an 8-foot lid is a sail. Latch or strap it ALWAYS β€” even "just for a minute." πŸ’¨
10

Mount & Seal the ACs

~1 hr
AC THROUGH END WALL β€” section view AC BOMEI structural collar first, then PT-15 full weather-seal β€” inside AND outside faces β›° slight OUTWARD tilt β†’ condensate drips outside, not on veggies GFCI-protected circuit Β· cord through grommeted hole Β· drip pan or drain line to greywater 🐒 tape shaman: BOMEI then PT-15
  • Slide each AC into its framed opening β€” snug fit on the 2Γ—2 frame from step 6.
  • Seal: BOMEI reinforced tape as the structural collar (inside + outside), then PT-15 over everything as the weather layer. The tapes finally get their moment. πŸŽ‰
  • Tilt each unit slightly outward so condensate drips OUTSIDE β€” catch with a drip pan (greywater rules apply).
  • Cords exit through drilled, grommeted holes β€” never through the door gap. GFCI on the circuit.
⚠ David's spec: these COWSAR units were chosen for MANUAL controls β€” a power flicker doesn't reset them. Don't swap for digital models.
10Β½

AC Corner Placement, Support & Travel Mounts

~1.5 hr

The layout: LOW unit in the far left-bottom corner of end wall A Β· HIGH unit in the far right-top corner of end wall B β€” a full diagonal both across and along the box. Corners are also the strongest part of the structure (2Γ—2 corner posts right there = free anchoring). Window ACs are heavy, so every pound bears on wood, never foam β€” and everything uninstalls in minutes for travel.

PLACEMENT β€” 3D view (corners diagonal both ways) AC LOW end wall A Β· far LEFT-BOTTOM corner AC HIGH end wall B Β· far RIGHT-TOP corner cold air river: low corner β†’ across + up β†’ high corner return 🐒 swimming in it πŸ’‘ corners = 2Γ—2 posts already there β†’ strongest anchor points on the whole box
LOW UNIT β€” cradle shelf (section view) 2Γ—4 cradle: legs to GROUND + diagonal brace β€” weight path goes wall β†’ legs β†’ earth AC (low) interior 2Γ—2 cleat under sill retainer batten β€” 2 screws, hand-remove
HIGH UNIT β€” Shaka's storage-box stand πŸ“¦ (section view) spare tapes Β· filters tools Β· gasket foam plywood storage chest OUTSIDE the cooler = the STAND for the high AC β€” one build, two jobs 🐒 doubled ΒΎ" ply lid (load-rated top) AC (high) interior 2Γ—2 cleat cam strap over chassis β†’ anchored to eye screws in box lid 1Γ—2 anti-walk cleats around AC feet
TRAVEL MODE β€” 3-minute uninstall, no tools on the foam 1 pop the cam strap + unscrew retainer batten (2 screws β€” or wingnuts on hanger bolts = zero tools) 2 slide AC straight out β€” cradle/box stand stays put 3 ACs travel UPRIGHT in the semi Β· foam port plugs (saved offcuts, taped edges) fill the openings Β· straps + battens live in the storage box 🐒 move slow, lift with legs
  • Weight path rule: every pound goes AC β†’ wood β†’ ground. The wall opening only locates the unit; it never carries it. (2Γ—2 opening frames from step 6 stay as the locator.)
  • LOW unit: exterior 2Γ—4 cradle shelf β€” two legs to grade + diagonal brace + interior 2Γ—2 cleat under the sill. Deck screws into the corner post, not into foam.
  • HIGH unit (Shaka's build): the exterior plywood storage chest doubles as the stand β€” double the lid (two layers ΒΎ" ply), sit it flush under the opening, cam-strap the AC chassis to eye screws. Bonus: the chest holds spare tapes, filters, and the travel hardware itself.
  • Easy in/out: retainer battens on 2 screws (upgrade: hanger bolts + wingnuts = tool-free), cam straps, and NOTHING screwed through foam. Target: one turtle, 3 minutes per unit.
  • Travel mode: port plugs from saved XPS offcuts (tape the edges) keep dust out of the box in transit; ACs ride upright and padded.
πŸ’‘ Sizing the storage chest: build it so the AC sill lands at the opening height minus the doubled-lid thickness β€” measure off the REAL box after the walls are up, not off the plan. Extra wood on hand = perfect for this.
⚠ After 24h upright rest post-travel before first power-on if a unit tipped in transit (compressor oil). And re-check the outward condensate tilt every re-install.
11

Paint, Shade & Anchor

~1 hr + dry
Aluminet / shade above painted WHITE ratchet strap over the lid strap ends β†’ concrete stakes (we're welding washer-tops onto 70 of them anyway) 🐒 strap check Γ—2 🐒 paint crew 🐒
  • Paint the whole box white (exterior latex) β€” cheap radiant rejection. Wrap the lid in spare Aluminet if we have offcuts.
  • Site it under shade, ACs on the shaded side, near the kitchen trailer but clear of the cook line (XPS + flame = no).
  • Anchor: ratchet strap over the lid to two staked points β€” 70 mph gusts vs a 300 lb box is a fair fight; don't make it fairer.
Playa physics: white paint + shade + air gap under β‰ˆ the ACs cycle instead of running flat-out. Cheap watts. ⚑
12

Test, Load & Feed the Shell

~2 hr test
CUTAWAY β€” the working coffin 🍎🍌🍊πŸ₯¬ 50.2Β°F min/max thermometer, logged at kitchen open cold loop: AC low β†’ across cases β†’ AC high βœ… pull-down test at the Gulch BEFORE the playa: close it up, run both ACs, hit ≀55Β°F and hold for 2 hours. Feel every seam for leaks (or incense-smoke test) β†’ extra PT-15 on anything that whispers. 🐒 🐒 🐒🐒🐒 the shell is fed πŸ₯¬
  • Pull-down test at the Gulch: lid on, both ACs running β€” target ≀55Β°F within the hour and stable ~50Β°F after. Fix leaks before the desert, not in it.
  • Mount the min/max thermometer inside, visible from the door end. Kitchen lead logs temp every morning (food-safety protocol).
  • Load discipline: cases off the Bonanza truck straight in β€” apples/oranges low (they take chill), greens and bananas up top away from AC blast.
  • Then: ~15 cases of fresh produce, cold and crisp, feeding 40 turtles for a week in the desert. The shell is fed. 🐒πŸ₯¬
Document it: photos of every step β†’ this page becomes next year's (and every camp's) playbook. Gift forward. 🎁

🧰 The Tool Wall β€” Dad-Borrow Checklist

Every tool the build needs, drawn so you can spot it on the garage wall. 🐒 = borrow from Dad Β· πŸ›’ = buy/own Β· βœ… = camp already has it. Used-in-step numbers on each card.

🐒
Circular Saw
steps 5 Β· 9
Rips ply sheets to 8'Γ—3' & 4'Γ—3'. Straight cuts w/ a clamped guide board.
🐒 borrow
↕ thin blade 🐒
Jigsaw
steps 6 Β· 9
AC cutouts + curved/inside cuts. Drill a starter hole first.
🐒 borrow
πŸ”© clutch on! 🐒
Drill / Driver Γ—2
steps 2 Β· 3 Β· 4 Β· 6 Β· 8 Β· 9 Β· 10
The whole build is screws. TWO drills = one drilling, one driving β€” no bit swaps. Grab Dad's spare battery too.
🐒 borrow both
πŸ”₯ hot wire βœ…
ROMECH Hot Knife
steps 3 Β· 5 Β· 6
All XPS cuts β€” clean, MOOP-free. Slow passes, both faces on 3" foam.
βœ… camp has it
tape measure + 4' level + straightedge bubble 🐒
Measure & Level Kit
every step
25' tape, 4' level, chalk line or straight board as a saw guide, speed square.
🐒 borrow
Γ—4+ clamp the foam while PL 300 grabs 🐒
Bar/Spring Clamps
steps 5 Β· 7
4+ of any style. Clamp guide boards for saw cuts + hold foam-ply while gluing.
🐒 borrow all he has
caulk gun PL 300 tube Γ—4 🐒
Caulk Gun
step 7
Standard cradle gun for the PL 300 foamboard tubes. Dad definitely has one.
🐒 borrow Β· glue πŸ›’
utility knife + deburr / sandpaper 120-grit block 🐒
Knife + Sanding Block
steps 5 Β· 9 Β· 10
Trim foam edges, break sharp ply corners, tune the lid fit.
🐒 borrow
50° drill bits + hole saw kit 🐒
Bits + Thermometer
steps 6 Β· 10 Β· 12
Twist bits (starter holes, cord pass-through w/ grommet) + min/max thermometer πŸ›’ (~$12).
🐒 bits Β· πŸ›’ thermo
brush + roller white exterior latex 1 gal 🐒
Paint Kit
step 11
Roller, tray, brush for edges. Dad's shelf probably has half a gallon of white already.
🐒 tools Β· πŸ›’ paint
2 straps + S-hooks β€” anchor the lid & box 🐒
Ratchet Straps Γ—2
step 11
Over-lid anchoring vs playa wind. Camp has some β€” confirm 2 are free for this.
βœ… camp (confirm)
PT-15 βœ… + BOMEI βœ… + painter's tape πŸ›’ (labels + clean paint lines) βœ…
Tape Trio
steps 5 Β· 9 Β· 10 Β· 11
Camp's PT-15 + BOMEI do the sealing; painter's tape does labels & paint edges.
βœ… mostly have
πŸ‘“ 🧀 ears Β· eyes Β· hands β€” hot knife fumes = work outside 🐒
PPE
every step
Safety glasses (saw + jigsaw), gloves, ear pro. Hot-knife XPS outdoors/ventilated only.
🐒 borrow / πŸ›’ cheap
πŸ—‘οΈ 2 sawhorses + sealed MOOP bag/bin 🐒
Sawhorses + MOOP Bin
steps 5 Β· 7
Cut & laminate flat at working height. Every shaving into the sealed bin β€” playa rules start at the Gulch.
🐒 borrow horses
πŸš— The Dad Raid, summarized: circular saw Β· jigsaw Β· 2 drill/drivers + batteries Β· clamps (all of them) Β· caulk gun Β· tape measure/level/square Β· sawhorses Γ—2 Β· drill bit set Β· PPE Β· roller kit. Buy new: PL 300 Γ—4, screws + fender washers, hinges/handles/weatherstrip, white paint, thermometer, painter's tape. Camp already has: hot knife, PT-15, BOMEI, ratchet straps. Bring Dad a birthday beer and return everything clean β€” that's the turtle way. 🐒🍺

πŸ“‹ One-Glance Cut List

PartPlywoodXPS (3")Lumber
Floor1Γ— ΒΎ" full 4Γ—81Γ— cut to ~7'9"Γ—3'9" (loose lay)2Γ—4: rim 2Γ—8' + 2Γ—~3'9" + 1 joist
Long walls Γ—22Γ— Β½" cut to 8'Γ—3'2Γ— cut to 8'Γ—3'corner 2Γ—2s Γ—4 @ 36"
End walls Γ—21Γ— Β½" cut to two 4'Γ—3'1Γ— cut to two 4'Γ—3'AC frames from 2Γ—2 offcuts
Lid1Γ— Β½" full 4Γ—8 (split optional)🧩 the saved 1' offcut strips2Γ—2 lip frame ~perimeter
Totals5 sheets (4Γ— Β½", 1Γ— ΒΎ")4 sheets β€” exactly what we own βœ…3Γ— 2Γ—4 Β· 6Γ— 2Γ—2

Build order at a glance: base β†’ deck β†’ corners β†’ cut β†’ laminate β†’ raise β†’ lid β†’ ACs β†’ paint/anchor β†’ test β†’ load. Half a day to a day with 2–3 turtles. 🐒