The Kitchen Build

An 8ร—36 trailer becomes a reheat-and-serve machine: propane cook line, real cold chain, dish pit outside, and not one drop of greywater on the playa. Six pictures, straight from the kitchen planning doc. ๐Ÿข

๐Ÿ”ฅ cook line received โœ… ยท chest freezer still to buy ๐Ÿ›’ ยท meal strategy: frozen boil-in-bag
8 ร— 36 ft
kitchen trailer
300k BTU/hr
cook line
30โ€“45 min
per boil batch
3 + 1
fridges + freezer
0 drops
greywater on playa
1

The Trailer Floor Plan

8 ft ร— 36 ft ยท top-down
KITCHEN TRAILER โ€” TOP-DOWN FLOOR PLAN 36 ft 8 ft โ–จ heat shields โš ๏ธ spec open (Jade) โšก power in via FLOOR pass-through propane OUTSIDE ๐Ÿ›’ 6ร— 20 lb COOK LINE โœ… 2ร— dual + BREWKIT2 โšก PREP PREP e-track rail โ€” confirm? SERVING WINDOW โ†“ 2-comp sink ๐Ÿ›’ โ„ cold zone: 3ร— fridges ๐Ÿ›’ ยท freezer โš ๏ธ NOT BOUGHT door โ†’ dish pit outside (step 4) ๐Ÿข everything rides inside on e-track โ€” the trailer is the turtle's shell
  • One wall does the hot work: both Backyard Pro dual ranges plus the BREWKIT2 single line up under the range hood, heat-shield panels behind them, propane tanks outside the same wall.
  • Cold lives at the back: 3 fridges stacked in the service zone with the chest freezer as deep reserve โ€” short walk from freezer โ†’ prep โ†’ cook line.
  • Sink by the door: dirty water never travels deep into the trailer; the dish pit and handwash station are just outside.
  • Serving window on the long wall โ€” campers queue on the playa side under an awning, crew stays inside.
  • All cable penetrations through the FLOOR, never the walls (David's rule, 7/16) โ€” one marked pass-through near the power drop.
Parts/status: 2-comp Regency sink โ€” ๐Ÿ›’ ordered ยท 3ร— GE 16.6 cu ft fridges โ€” ๐Ÿ›’ ordered ยท chest freezer 20 cu ft โ€” โš ๏ธ NOT BOUGHT, HIGH priority (David: "just buy it") ยท stainless prep tables + e-track โ€” confirm status in inventory
2

The Cook Line & Heat Shields

elevation view ยท propane rules
COOK LINE ELEVATION โ€” SHIELDS BEHIND, TANKS OUTSIDE heat-shield panels โ€” โš ๏ธ spec OPEN (Jade) 1" standoff detail: 1" air gap 2ร— dual Backyard Pro (150k BTU/hr each) + BREWKIT2 single โœ… received FIRE extinguisher (Class K/ABC) + fire blanket trailer wall 10 PSI hose + regulator โ€” ships with the Backyard Pro, no manifold tanks OUTSIDE โ€” always โš ๏ธ propane is heavier than air โ€” it pools LOW. Ventilate at floor level ยท cylinders NEVER stored inside ๐Ÿข 20 lb tanks freeze up above ~90โ€“110k BTU/hr โ€” math in the bullets
  • The workhorse: 2ร— Backyard Pro dual propane ranges, 150,000 BTU/hr each โ€” 300k BTU/hr total. Each ships with its own 10 PSI hose + regulator, so no separate manifold.
  • Heat shielding behind the ranges is a flagged, open item โ€” panels on 1" standoffs so air washes the wall. Spec and procurement still needed before build week.
  • Tank-size math: a 20 lb cylinder can only deliver ~90โ€“110k BTU/hr before it freezes up. A 40 lb tank delivers ~150โ€“185k, a 100 lb tank 300k+. Running a range hard? Size up cylinders or run two tanks with a switchover.
  • Fire kit within reach of every cook station: Class K or ABC extinguisher + fire blanket. Four extinguishers and two blankets are in the camp safety kit.
  • All heat is propane this year โ€” no electric heat appliances on David's 70A grid (no microwave, no toaster oven; coffee = pump pots + #6 cone filters).
Parts/status: 2ร— Backyard Pro dual ranges โ€” โœ… received ยท BREWKIT2 single โ€” confirm status ยท 6ร— 20 lb propane tanks โ€” ๐Ÿ›’ NOT bought ยท heat-shield panels โ€” โš ๏ธ spec open (Jade) ยท extinguishers + blankets โ€” in safety kit, verify received
Never improvise gas work. This page documents the camp's plan โ€” anything structural, electrical, or propane gets signed off by the camp's qualified people (David / Jarrett) before it's final.
3

The Boil-in-Bag Workflow

reheat & serve โ€” NOT cooking
ONE MEAL SERVICE, START TO FINISH REHEAT & SERVE โ€” THE KITCHEN DOESN'T COOK โ„๏ธ FROZEN BAGS pre-cooked, sealed ๐Ÿฒ BOIL 30โ€“45 MIN big pot ยท rolling boil ๐ŸŒก๏ธ TEMP CHECK instant-read โœ” hot ๐Ÿฅ˜ HOT HOLD hotel pans ยท LIDS ON (dust) ๐Ÿฅ„ SERVING LINE ladles ยท posted times ๐Ÿฝ๏ธ DISPOSABLES paper โ†’ bag trash NOW! big burner = workhorse ยท camp stoves = backup (coffee, eggs) โ˜•๐Ÿณ ๐Ÿข long tongs or a slotted spoon pull hot bags โ€” fingers never go near the pot
  • The strategy shift (kitchen planning doc, 7/25): fully cooked, frozen, pre-ordered meals. Bags submerge in a big pot of boiling water โ€” ~30โ€“45 minutes per batch โ€” then go straight to hot-hold and the line.
  • Must-haves for the reheat loop: stock pots big enough to submerge multiple bags at once, long tongs/slotted spoon, a timer, and an instant-read thermometer (confirm water temp, verify food temp).
  • Hot-hold matters on playa: hotel pans or chafing dishes with lids โ€” wind and dust are always trying to eat first.
  • Strong case for disposable plates/bowls โ€” it eliminates an entire dishwashing loop and saves serious water. Bag trash immediately so it never becomes MOOP.
  • Throughput is the open question: how many bags fit per pot, and is one batch enough for a full service? That's for the kitchen meeting (see the list at the bottom).
Parts/status: large stock pots โ€” ๐Ÿ›’ to source (must fit the big burner) ยท hotel pans / chafing dishes โ€” ๐Ÿ›’ to source ยท instant-read thermometer + timer + long tongs โ€” ๐Ÿ›’ to source ยท disposable serviceware โ€” qty TBD at kitchen meeting
4

The Dish Pit โ€” Outside the Trailer

wash ยท rinse ยท sanitize
WASH STATION โ€” JUST OUTSIDE THE DOOR TRAILER SCRAPE first โ€” bench scraper โ†’ trash 1 WASH 2 RINSE 3 SANITIZE biodegradable soap sanitizer rinse HANDWASH โ€” separate station, required โš ๏ธ jug + spigot + soap catch bucket below greywater โ†’ step 5 loop ๐Ÿข
  • Three tubs, in order: wash โ†’ rinse โ†’ sanitize. Biodegradable dish soap only โ€” everything eventually evaporates or hauls out.
  • Scrape before you wash: rubber bench scrapers send food solids to the trash, not the tubs. This one habit saves more water than any gadget.
  • The handwash station is separate and non-negotiable โ€” food-safety requires it apart from the dish pit, and it's one of our flagged open items: jug with spigot, soap, paper towels, catch bucket.
  • Keep the whole pit outside the trailer โ€” splashes, suds, and greywater handling stay out of the food zone.
  • Cut high-crevice tools (graters, mandolines, immersion blenders) and buy pre-prepped ingredients โ€” less to wash, less water hauled.
Parts/status: 3 dish tubs โ€” ๐Ÿ›’ to source ยท rubber bench scrapers โ€” ๐Ÿ›’ to source ยท biodegradable soap + paper towels โ€” ๐Ÿ›’ to source ยท handwash station โ€” โš ๏ธ flagged item, spec needed ยท 2ร— SHURflo pumps โ€” โœ… received (fresh/grey transfer)
5

The Greywater Loop

LNT โ€” non-negotiable
EVERY DROP IS ACCOUNTED FOR sink + dish tubs greywater collection containers waste pump โœ… SHURflo ร—2 received EVAPORATE โ€” non-negotiable evap system: sourced? โš ๏ธ meeting question tote haul-out backup ZERO DROPS not one drop hits the playa โ€” LNT ๐ŸŒฑ ๐Ÿข mesh-filter every pour โ€” food solids go to trash, never into the evap bed
  • The rule is absolute: no greywater drains onto the playa. Sink and dish tubs dump into collection containers โ€” nothing overflows, nothing spills.
  • Evaporation is the plan of record ("non-negotiable at BM" per the planning doc), with a haul-out tote as the backup path. The exact evap system still needs to be sourced โ€” it's an open question for the meeting.
  • The SHURflo diaphragm pumps (โœ… received) move water where muscle can't โ€” fresh water in, greywater out. Practice with them before the playa.
  • Solids never enter the loop: scrape first, filter every pour. An evap bed clogged with food is a MOOP factory.
  • Mark greywater hoses and containers WASTE โ€” anything that touches waste stays waste forever.
Parts/status: 2ร— PENTAIR SHURflo pumps โ€” โœ… received ยท greywater collection containers โ€” ๐Ÿ›’ to source ยท evaporation system โ€” โš ๏ธ not yet sourced (meeting question) ยท waste-marked hoses โ€” buy double, mark 2 WASTE
6

The Cold Chain Map

everything under shade
COLD CHAIN โ€” SHADE FIRST, THEN ICE COLD ALUMINET SHADE โ€” compressors never see direct sun โ„๏ธ CHEST FREEZER deep reserve ยท open 1ร—/day โš ๏ธ NOT BOUGHT โ€” HIGH Honda 2200i = backup 3ร— FRIDGES daily service ยท โ‰ค40ยฐF ๐Ÿ›’ ordered (GE 16.6 cu ft) daily ๐Ÿฅฌ VEGGIE COFFIN produce ยท ยพ built ๐Ÿ”จ prep ๐Ÿข shade first, then ice cold โ€” every open lid is compressor hours on a 70A grid
  • Three tiers of cold: chest freezer = deep reserve (frozen meal bags), 3 fridges = daily service, veggie coffin = produce. Each tier opens less often than the one after it.
  • Freezer discipline: open once a day, pull the day's bags into a fridge to stage, close it. Every open lid is compressor hours on a grid with a 70A limit.
  • The chest freezer is the #1 kitchen buy โ€” 20 cu ft chest, GE/Frigidaire class, 120V. David's word (7/16): "just buy it."
  • Shade is part of the cold chain: Aluminet over every compressor. A fridge in direct playa sun loses the fight by noon.
  • Backup power: the Honda 2200i is earmarked as the freezer's safety net if the camp grid hiccups.
Parts/status: chest freezer 20 cu ft โ€” โš ๏ธ NOT BOUGHT, HIGH (just buy it) ยท 3ร— GE 16.6 cu ft fridges โ€” ๐Ÿ›’ ordered ยท veggie coffin cold box โ€” ๐Ÿ”จ ยพ built (12-step build guide) ยท Honda 2200i backup โ€” under consideration

๐Ÿ“‹ Kitchen Materials at a Glance

ItemQtyStatusStep
Backyard Pro dual propane ranges (150k BTU/hr ea)2โœ… received1โ€“2
Backyard Pro BREWKIT2 single burner1confirm status1โ€“2
Heat-shield panels + 1" standoffssetโš ๏ธ spec open โ€” flagged (Jade)2
Propane tanks 20 lb (see tank-size math)6๐Ÿ›’ NOT bought2
GE 16.6 cu ft refrigerators3๐Ÿ›’ ordered1, 6
Chest freezer ~20 cu ft (GE/Frigidaire, 120V)1โš ๏ธ NOT bought โ€” HIGH, "just buy it"1, 6
Regency 2-compartment sink w/ drainboards1๐Ÿ›’ ordered1
PENTAIR SHURflo diaphragm pumps2โœ… received4โ€“5
Large stock pots (fit the big burner, multi-bag)2+๐Ÿ›’ to source3
Hotel pans / chafing dishes + lids ยท ladles ยท tongs ยท timer ยท thermometerset๐Ÿ›’ to source3
Dish tubs ร—3 ยท bench scrapers ยท biodegradable soap ยท paper towelsset๐Ÿ›’ to source4
Handwash station (jug + spigot, soap, catch bucket)1โš ๏ธ flagged โ€” spec needed4
Greywater evaporation system + collection containerssetโš ๏ธ not yet sourced5
Disposable plates/bowls/cups/cutleryTBDqty decided at kitchen meeting3
Fire extinguishers (Class K/ABC) + fire blankets4 + 2in safety kit โ€” verify received2

Live counts always win over this table โ€” check the Inventory Command Center before any supply run. ๐Ÿข

โ“ Open Questions for the Kitchen Meeting

Straight from the kitchen planning doc (7/25) โ€” answer these before the menus and the shopping list get locked: